Mechanical Solutions Inc.

Metropolitan Business Academy
Mechanical Contractor: Pipeology - Hamden CT
 
New Haven Public Schools (NHPS) partnered with the S/L/A/M Collaborative to design the Metropolitan Business Academy, an energy-efficient 89,000-square-foot school in New Haven, CT.
 
NHPS wanted to develop a building that incorporates energy efficiency and conservation, maintainability, and a healthy environment for the students, faculty, and staff. In addition, the project is part of a 14-year program started by the City of New Haven in 1996 to rebuild 47 public schools. Due to growing utility costs, the City and its School Construction Program later introduced the High Performance Schools Design Requirements (HPSDR), which mandate that every project be designed with an eye toward energy efficiency and sustainability.

Armstrong Model 6535 Triplex Pressure Booster System
Square D Frequency Drives and Motor Starters were utilized for all the rotating equipment
Armstrong Pump Model 4030 Base Mounted End Suction Pumps with OSHA Coupling Guards and Premium Energy Efficient Motors
Product details

Armstrong Model 6535 Triplex Pressure Booster System

Square D "S Flex" Variable Frequency Drives and Motor Starters were utilized for all the rotating equipment.
 
 
Armstrong Pump Model 4030 Base Mounted End Suction Pumps with OSHA Coupling Guards and Premium Energy Efficient Motors